Tanzania Project – Supply of ACSR ABC ACCESSORIES

Tanzania Project – Supply of ACSR ABC ACCESSORIES

What We Supplied

Brief Descriptionof Supplies and Related Services Specs Unit of Measure Estimated Quantity
ACSR Conductors (Dog) –100mm2 S16 km 1232
ACSR Conductors (Rabbit)-50mm2 S16 km 200
ACSR Conductors (Rabbit)-50mm2 S16 km 100
Shield Wire S16 km 100
S/NO Description Unit of Measure Quantity
1 ABC Dead End Clamp 2x25mm2 EA 1562
2 ABC end cap 25-50sqmm EA 1562
3 ABC end cap 50-95 sqmm EA 1562
4 ABC Three Phase Dead End Clamp STC (4x16x25mm2) EA 1500
5 Cable tie (380MM*8MM) EA 300
6 Coach screw EA 1250
7 Eye bolt c/w Eye-nuts M16x250mm (5/8’’x10’’) C/W EYE NUT EA 37171
8 Piercing connector 25 – 95mm2 EA 6750
9 Pig tall bolt complete for (ABC) EA 19825
10 Pre-insulated Sleeves EA 500
11 Suspension Clamp for ABC (25-50)MM EA 9912
12 Suspension Clamp for ABC (50-95)MM EA 9912
13 Tension clamp for ABC 50mm – 95mm2 EA 18586
14 Tension clamp for ABC 25mm- 50mm2 EA 18586
15 Pigtail Couch Screw EA 19825

Our Project Clients

Owner: Tanzania Electric Supply Company Limited(TANESCO)

Tanzania Power Transmission and Distribution Line System

TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.

TANESCO future transmission network will include ongoing projects of 414 km of 400 kV Singida – Arusha – Namanga transmission line , 293km of 220kV Transmission line from Bulyanhulu-Geita-Nyakanazi-Rusumo, 161km of 220kV SGR 1 Transmission line from Dar es Salaam to Morogoro, 381km of 132kV Tabora – Ipole – Inyonga- Katavi transmission line, 395km of 132kV Tabora – Urambo – Nguruka (Mganza) – Kigoma (Kidahwe) Transmission line and 14km of 132kV Kibada Kigamboni transmission line (this will have a pie configuration at Kibada from the Kurasini Mbagala Transmission line).

Other projects at which are at inception stages includes 400 kV double circuit TL from Julius Nyerere Hydropower plant to Dodoma and Kinyerezi via Chalinze and associated substations, Construction of 372 km, 400 kV double circuit TL from Julius Nyerere Hydropower plant to Kinyerezi via Kibiti, Somangafungu – Kibiti and associated substation at Kibiti, 60km, 220kV from Chalinze to Bagamoyo,64km 220kV Segera – Tanga, 280km, 400kV line from Nyakanazi – Kigoma, 530km of 400kV Transmission line from Kigoma -Katavi – Sumbawanga, 620km, 400kV line from Iringa – Kisada – Mbeya – Tunduma – Sumbawanga, 4km, 330kV from Tunduma to the border with Zambia, 400kV line from Mtwara – Songea,414km of 220 kV Morogoro – Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations and Construction of various TANESCO buildings including Regional and Districts offices.