Eswatini Rural Electrification Project – ACSR Mink, ACSR Fox, CNE SNE Airdac Conductor 16mm2 10mm2 Cables Supply
What We Supplied
No. | Item | Structure | Packing Size |
Flange D*Barrel D*Outer Width | |||
1 | ACSR Mink | AL 6/3.66+ST 1/3.66 | 1100*1100*1000MM 5000M GW:1350KG |
2 | ACSR Fox | AL 6/2.79+ST 1/2.79 | 1100*1100*800MM 5000M GW:795KG |
3 | Airdac cable 10mm2 CNE | Phase :7/1.35mm Nertal: 18/0.85mm XLPE Insulated | 1100*1100*1100MM 4000M GW:1290KG |
4 | Airdac cable 10mm2 SNE | Phase :7/1.35mm Earth: 3/1.78mm Nertal: 7/1.33mm Com: 2/1.13mm XLPE Insulated | 1100*1100*1100MM 4000M GW:1480KG |
5 | Airdac cable 16mm2 SNE | Phase :7/1.67mm Earth: 3/2.2mm Nertal: 7/1.76mm Com: 2/1.13mm XLPE Insulated | 1100*1100*1100MM 3000M GW:1619KG |
Our Project Clients
Owner: Eswatini Electricity Company(EEC)
Eswatini Overhead Transmission Line
This is a World Bank loan funded project that is divided into four components. Component 1 is desired to at Hluthi, Matsanjeni and Lavumisa. Component 2 of the project is aimed at increasing access to construct an 87km 132kV overhead transmission line from Nhlangano to Lavumisa together with three substations electricity in the Shiselweni Region as part of the Eswatini government’s initiative to attain universal access to electricity through the Rural Electrification Programme. The beneficiaries in Component 2 will be about 8000 homesteads that will be connected to grid electricity by the end of the implementation of this project. Component 3 for the project is aimed at providing government with the technical support required to implement various programmes to improve the conditions for the electricity industry in the Eswatini. Component 4 is a special dispensation designed to serve as access to Emergency Funds for qualifying emergency conditions. Completion of the project is planned for December 2023.